If you are buying land to build townhouses, your loan will usually be set up in two parts: the land purchase first, then staged payments for the build.

That structure shapes your deposit, your repayments and how your builder gets paid. This guide is for Runaway Bay buyers weighing up a land purchase and a townhouse build, and it explains what to line up before you sign anything.

How Does a Construction Loan Work When You Buy Land First?

A construction loan releases money in stages as your build progresses, rather than as one lump sum. The land is usually paid for at settlement, and the build is funded through progress payments to your builder.

Lenders commonly ask for the building contract, plans and approvals, but requirements vary by lender. Terms such as the number of drawdowns, inspection requirements, time limits and fees are set by each lender, so they differ. Our construction loans page explains the process in more detail, and we can compare lenders from across Australia for you.

What Is a Progress Payment Schedule?

A progress payment schedule is the list of stages at which your builder can claim payment, such as base, frame, lock-up and fixing. In Queensland, payments must relate to the work completed.

Queensland rules also limit the deposit to 5 per cent of the contract price for contracts of $20,000 or more. A builder cannot claim more than 50 per cent of the contract price, deposit included, until at least 50 per cent of the on-site work is complete. Paying early or paying more than the contract amount can reduce your protection under the Queensland Home Warranty Scheme. Many lenders may require an inspection before releasing a payment, depending on the lender's terms.

Do You Pay Interest on the Whole Loan During the Build?

Usually you pay interest only on the amount drawn down so far, not on the full approved limit. Your repayments start small and rise as each stage is paid.

Here is an illustrative example at 6.75% p.a. Say $400,000 has been drawn at the frame stage. Annual interest on that amount is $27,000, or about $2,250 a month. If the drawn balance later reaches $600,000, the interest-only repayment at the same rate becomes $40,500 a year, or about $3,375 a month. Your actual rate will depend on your lender and your deposit, and our borrowing capacity page is a good place to test what suits your budget.

The repayment type during the build and after completion depends on the lender, and some lenders may start principal and interest repayments earlier. Check this in the loan terms so you know when your repayments will change.

Why Costs Can Rise Above the Contract Price

Many lenders limit funding to the approved contract, so any extra cost needs to be planned for before you apply. A fixed price contract sets the price up front, while a cost plus contract can change as the build goes on.

Variations, such as upgrades or changes to the plans, may need separate funding or lender approval. A cost plus contract gives you flexibility, but it also leaves you carrying more of the risk if costs climb.

Ready to get started?

Book a chat with a Finance & Mortgage Broker at GC Finance today.

Townhouse Build Example: From Land Purchase to Completion

Consider a couple in Runaway Bay who buy a block with the aim of building two townhouses, living in one and renting the other. The land is settled first, and a registered builder is engaged under a fixed price building contract once council approval is in place.

The situation: they want to know whether one loan can cover both the land and the build. The solution: their broker looks at lenders that fund the land purchase and then release the build costs in stages, and checks how each lender treats a dual-occupancy project. APRA guidance says it would be reasonable for a lender to treat an incomplete duplex as an owner-occupied standard loan where the borrower will live in one dwelling and rent the other, although each lender applies its own policy.

The outcome: the couple choose a lender that accepts the structure. They confirm in the loan terms what repayment type applies during the build and after both townhouses are finished, and they set their budget with that in mind from day one.

How Lenders Check Whether You Can Afford the Repayments

Lenders that are regulated by APRA must test whether you could still meet repayments if rates were 3 percentage points above the loan's rate. APRA confirmed in May 2026 that this buffer remains in place.

That test applies to a construction loan as well. APRA's limit on high debt-to-income lending does not apply to finance for building new dwellings, but the serviceability check still does. If part of your income is a bonus or overtime, lenders may count only a portion of it. A broker can check this before you commit to land.

Tax Points to Raise With Your Accountant Before You Buy

If you plan to rent out a townhouse, how the loan interest is treated for tax can depend on whether the loan is for the land or for the construction. Speak with your accountant before you buy, because your result depends on your circumstances.

The ATO says holding costs for vacant land, including interest on money borrowed to buy the land, cannot be claimed while the land remains vacant. Interest on borrowings for the construction is treated differently. Where one loan covers both purposes, the interest has to be apportioned. This is one reason some buyers ask whether separate loan accounts make sense for the land and the build, and your accountant can advise on that. If you are weighing up a rental townhouse, our investment loans page covers that side of things, and if this is your first home, see our first home buyers page.

Will a First Home Owner Grant Apply to a Townhouse Build?

Queensland offers a $30,000 grant for eligible new homes valued under $750,000, including land and contract variations. It was continued for contracts signed from 1 July 2026.

The grant is for first home buyers building or buying a new home, and rules on eligibility apply. Check the details with the Queensland Revenue Office or your broker before you sign a contract, as the timing of your contract matters.

The team at GC Finance, which serves Runaway Bay, can walk you through the options. Call one of our team or book an appointment at a time that works for you, and we will map out the land and build funding together.

Frequently Asked Questions

How does a construction loan work when buying land for townhouses?

The land is usually paid for at settlement, and the build is funded through staged progress payments to your builder. Many lenders may require an inspection before releasing a payment, depending on their terms.

Do I pay interest on the full construction loan amount?

Usually you pay interest only on the amount drawn down so far. Repayments rise as more of the loan is released to your builder. The repayment type during the build and after completion depends on your lender.

Is there a deposit limit on a Queensland building contract?

For contracts of $20,000 or more, the maximum deposit is 5 per cent of the contract price in most cases. A builder also cannot claim more than 50 per cent of the price until at least half the on-site work is complete.

Can I claim the loan interest on land I plan to build a rental townhouse on?

Tax treatment can differ between the land loan and the construction loan, and interest is apportioned where one loan funds both. Ask your accountant for advice on your situation.