Building a new home means dealing with fees that don't appear on standard home loans. You'll encounter progressive drawing fees, inspection charges, and costs tied to how your builder gets paid across multiple stages.
Construction finance works differently because the lender releases funds in stages as your build progresses, not as a single lump sum. Each time money is released, fees may apply. Some lenders charge per drawdown, others charge a flat fee upfront, and a few don't charge separately at all. The difference between these structures can add thousands to your build budget, and it's rarely explained clearly until you're comparing loan offers.
Progressive Drawing Fees and How They Add Up
A progressive drawing fee is charged each time the lender releases funds to your builder. Most lenders charge between $300 and $500 per drawdown, and a typical residential build involves five to seven progress payments. That means you could pay anywhere from $1,500 to $3,500 in drawing fees alone, depending on your lender and your construction draw schedule.
Some lenders bundle this into a single upfront fee, usually between $1,200 and $2,000, which covers all inspections and progress payments for the life of the build. Others don't charge a separate progressive fee at all, instead building the cost into the interest rate or loan establishment fee. The second approach sounds convenient, but it can mean you're paying more over time if the rate is higher.
Consider a scenario where a borrower is building a custom design home in Coomera with a registered builder under a fixed price building contract. The loan amount is $650,000, and the build will take around eight months with six scheduled progress payments. If their lender charges $400 per drawdown, that's $2,400 in fees. A lender offering a flat $1,500 fee for unlimited drawdowns would save them $900, even if the second lender's interest rate is 0.05% higher. Over an eight-month construction period, that rate difference costs far less than the fee saving.
Inspection Costs and Who Pays Them
Each progress payment requires a progress inspection to confirm the stage of work is complete before funds are released. Lenders either send their own valuer or engage a third-party inspector. The cost is usually included in the progressive drawing fee, but some lenders charge separately, particularly if the build is outside their standard service area or if additional inspections are needed.
On the Gold Coast, most major lenders include inspection costs within their drawing fees. If you're building in areas like Pimpama, Upper Coomera, or further west toward Guanaba, some lenders may add a travel surcharge or classify the site as regional, which can increase inspection fees by $100 to $200 per visit.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at GC Finance today.
If your build involves non-standard construction methods, a cost plus contract, or if you're acting as an owner builder, expect additional inspection requirements. Lenders treat these builds as higher risk, and the inspection process becomes more detailed. You might be charged for engineer reports, soil tests, or second-opinion valuations. These aren't listed as construction loan fees in the loan documents, but they're still costs you'll need to cover before drawdowns are approved.
Interest Charges During Construction and Why They're Not Fixed
During the build, you only pay interest on the amount drawn down, not the full loan amount. If $200,000 has been released to your builder so far, you're charged interest on $200,000. Repayments are usually interest-only during construction, and the loan converts to principal and interest once the build is complete and you move in.
The construction loan interest rate is typically variable, even if you plan to fix your rate once the loan converts to a standard home loan. That's because the loan amount increases each time a drawdown occurs, and lenders won't lock in a fixed rate on a balance that's still changing. If rates rise during your build, your repayments will increase, even though you're only paying interest.
In one scenario we see often, a buyer purchases a house and land package in Ormeau with settlement on the land portion scheduled for three months before building commences. They're paying interest on the land loan during that period, then interest on both the land and progressive construction funding once the build starts. If the build takes nine months and rates increase by 0.25% halfway through, their monthly repayments during construction could rise by $80 to $150 depending on how much has been drawn down at that point. It's not a huge jump, but it's one that catches people off guard if they've budgeted to the dollar.
Lender Fees, Application Fees, and What's Actually Negotiable
Most construction loan applications attract the same establishment or application fee as a standard home loan, usually between $400 and $600. Some lenders waive this fee as part of a promotion or if you're refinancing other lending to them. It's worth asking, but it's not the fee that makes the biggest difference to your overall cost.
The progressive payment schedule and how your lender structures their drawing fees will have a much larger impact. A lender charging $500 per drawdown with a slow approval process can delay payments to your builder, which may trigger penalty clauses in your building contract. A lender charging $1,200 upfront with a three-day turnaround on progress approvals can actually save you money, even if the upfront fee looks higher on paper.
When comparing construction finance, focus on the total cost of fees across the build period, not just the headline rate or the first fee you see listed. Ask how many drawdowns are included, whether inspection costs are separate, and how long approvals take once your builder submits a progress claim.
Council Approval, Development Application Costs, and What the Lender Won't Cover
Your construction loan covers the build itself, but it won't cover the upfront costs of getting council approval or submitting a development application. Those costs sit with you or your builder, depending on your contract. On the Gold Coast, a standard development application for a new dwelling can range from $2,500 to $6,000 depending on the site, the design, and whether you need additional reports for bushfire, flood, or environmental overlays.
If you're building in areas like Tallebudgera, Currumbin Valley, or parts of Mudgeeraba where bushfire or koala habitat overlays apply, expect higher DA costs and longer approval times. Lenders require council plans and building approvals before they'll issue a formal loan offer, so these costs need to be paid well before your first drawdown.
Some builders include DA costs in their fixed price contracts, others charge separately. Either way, it's not something your lender will fund as part of the construction loan unless you've specifically structured the loan to include pre-construction costs, which is rare and usually only available if you already own the land outright.
When Fixed Price Building Contracts Affect Your Loan Structure
Most lenders prefer fixed price building contracts because the total build cost is agreed upfront, which makes the loan amount and progress payment schedule predictable. If you're working with a project home builder or a volume builder offering house and land packages, you'll almost certainly be on a fixed price contract.
If you're doing a custom design or working with a builder on a cost plus contract, fewer lenders will offer construction funding, and those that do will charge higher fees or require a larger deposit. The reason is risk. A cost plus contract means the final build cost isn't locked in, so the lender can't be certain the loan amount will cover the project. They'll want a bigger buffer, and they'll scrutinise every progress claim more closely, which adds time and cost to each drawdown.
Owner builder finance is even more restricted. Most major lenders won't lend to owner builders at all, and the specialist lenders that do charge higher rates, higher fees, and require detailed project plans, fixed quotes from all sub-contractors, and evidence that you have the skills or supervision to manage the build. Expect to pay an additional 0.5% to 1% in interest, plus higher drawing fees and more frequent inspections.
What Happens If You Commence Building Late or Not at All
Most construction loan approvals require you to commence building within a set period from the disclosure date, usually six to twelve months. If you don't start within that window, the loan offer lapses and you'll need to reapply. Reapplying means paying application fees again, going through another credit assessment, and potentially dealing with different interest rates or lending criteria.
If you've already settled on the land and you're paying interest on a land loan while waiting for building to start, every month of delay costs you. On a $300,000 land loan at current variable rates, you're paying roughly $1,500 to $1,800 per month in interest with nothing to show for it. Delays in getting council approval, securing a builder, or finalising your house design can push you past the commencement deadline, which is why having your development application lodged and your building contract signed before you apply for finance makes the process much smoother.
How GC Finance Structures Construction Loan Comparisons
We work with lenders across Australia that offer different fee structures, drawdown processes, and approval times for construction funding. The right lender for a house and land package in Parkwood with a volume builder might not be the right lender for a custom build in Tallebudgera with a boutique builder. We compare the total cost of fees across your specific build timeline, not just the interest rate.
If you're ready to look at construction loan options or you want to understand what your build will actually cost to fund, call one of our team or book an appointment at a time that works for you.
Frequently Asked Questions
What is a progressive drawing fee on a construction loan?
A progressive drawing fee is charged each time your lender releases funds to your builder during the build. Most lenders charge between $300 and $500 per drawdown, and a typical build involves five to seven progress payments. Some lenders charge a flat upfront fee instead, which can be more cost-effective depending on your build schedule.
Do I pay interest on the full loan amount during construction?
No, you only pay interest on the amount drawn down so far, not the full loan amount. Repayments are usually interest-only during construction and convert to principal and interest once the build is complete. The interest rate during construction is typically variable, even if you plan to fix the rate later.
What happens if I don't start building within the loan approval period?
Most construction loan approvals require you to commence building within six to twelve months from the disclosure date. If you don't start within that timeframe, the loan offer lapses and you'll need to reapply, which means paying application fees again and going through another credit assessment.
Are council approval and development application costs included in a construction loan?
No, development application and council approval costs are separate and need to be paid before your lender will issue a formal loan offer. On the Gold Coast, DA costs typically range from $2,500 to $6,000 depending on the site and design. These costs sit with you or your builder depending on your contract.
Why do some lenders charge more for owner builder or cost plus contracts?
Lenders view owner builder and cost plus contracts as higher risk because the final build cost isn't locked in upfront. They charge higher fees, require larger deposits, and conduct more detailed inspections at each progress payment. Most major lenders won't offer owner builder finance at all, leaving you with specialist lenders that charge a premium.